Milestone
Pipeline Engineering and Survey
2021
Achieving 475+ km Pipeline Engineering and Survey
The total length of the pipeline that has been surveyed and engineered by PT. Pustek E&T from 2015 to 2021
Acquisition Various Survey Equipment
2020
Survey Equipment for Topography, Soil Investigation
PT. Pustek E&T purchasing additional survey equipment such as GNSS RTK, Drones, Boring tools, sondir, batterymetry tools, mapping software, assessment equipment such as thickness meters, rebar scanners, pundits, hardness testers, etc.
Blanket Engineering Contract
2019
Engineering Blanket
Started to get blanket engineering contract with Petrochina ltd. for various types of engineering activities in oil and gas for 2 years contract.
Finishing DED 7 Power Plant
2018
Engineering for Power Plant
Engineering for Dual fuel system power plant in 5 east region Indonesia, total 120 MW, diesel engine and gas engine system. 2 Power plant PLTD (diesel engine) with total capacity 60 MW, including electrical networks.
27 Atmospheric Tank
2017
API 620 Atmospheric Tank
PT. Pustek E&T completed a total of more than 25 DED for atmospheric tanks, with the designation of crude oil, HSD and petroleum products.
CNG Plant
2015
DED CNG Plant
Start DED of Compressed Natural Gas Station, for Power Plant Peaker with capacity 20 MMSCFD, Bangkanai, Kalimantan.
Start Consulting
2012
Start consulting services
Our founders started consulting services in the fields of oil and gas, natural gas networks and power plants.